One Stop Centre (OSC) One Stop Centre (OSC)

 Name :  Pn. Rohana Binti Mohd Nor
 Position :  Town & Country Planning Officer
 (Bearing [J44])
 Email :  rohana@mpaj.gov.my
 Telephone No :  03-42978376
 
Establish Functions of One Stop Centre (OSC)
 
The function of the One Stop Centre (OSC) is to accept applications for planning permission, building plans, earthworks, road and drainage plans simultaneously so as to be distributed to the relevant technical department to get reviews and comments within the stipulated time. It is through the One Stop Centre that the processing of development proposal applications could be reduced to 4 (four) to 6 (six) months in contrast with previous practices which consumed between 3 (three) to 5 (five) years. This consequently could improve the delivery system at the LA level. The 4-month period is for selected projects, high-impact projects, foreign ports projects as well as government projects. As for other projects, the norm for processing period is 6 months.
 
Establish purpose of One Stop Centre (OSC)
  • To strengthen the delivery system procedures and development proposal processing in accordance with the provisions of the National Land Code 1965, the Town and Country Planning Act 1976 (Act 172), the Street, Drainage and Building Act 1974 (Act 133).
  • To establish delivery system procedures and transparent and consistent development proposal processes for all Local Authorities (LAs) via the establishment of One Stop Centre.
  • To assist Local Authorities in expediting development proposal applications processing by providing a clear-cut and transparent flow chart.
 
Objective of One Stop Centre (OSC)
To reduce processing time of development proposal applications and to improve delivery system, development proposal processes and procedures by the Ampang Jaya Municipal Council.
 
Roles of One Stop Centre (OSC)
  • Coordinate and process planning permission applications, engineering plans, building plans and land development applications under the provision of Section 124A and 204D KTN;
  • To inform the approval results for planning permission applications, engineering plans and building plans to applicants;
  • To prepare application status reports
 
Types of Application received at OSC
  • Planning Permission Plans Application
  • Arrangement Plan Application
  • Extension / Planning Permission for Additional Extension Application
  • Residential Areas / Address Naming Proposal Application
  • Engineering Plan (Earthworks) Application
  • (Residential and Street Light Infrastructure) Engineering Plan Application
  • Building Plan Application
  • Landscape Plan Application
 
 
 

Polls Display Polls Display

Adakah anda berpuas hati dengan pencapaian piagam pelanggan MPAJ?.
% Votes
0% 0 Yes
0% 0 No

Total Votes: 0
 

Prayer Times Prayer Times


Saturday, 19 April 2014
Wilayah Persekutuan
Kuala Lumpur

 

Calendar Calendar

20 April 2014
S M T W T F S
30 31 1 2 3 4 5
6 7 8 9 10 11 12
13 14 15 16 17 18 19
20 21 22 23 24 25 26
27 28 29 30 1 2 3
 
  POLL   PRAYER TIME   CALENDAR  

POLL | PRAYER TIME | CALENDAR